BASE Industries consulted with the client and provided maintenance for Rio Tinto Cape Lambert, the biggest of its two Pilbara Iron Ore processing and out loading facilities. Consisting of 4 ship loaders and 5 ore car dumpers and processing 333mt or some of the world finest Iron Ore and the famous Pilbara blend together with its sister site Dampier.
Conveyor belt, pulley, idler, drive, and counterweight replacement and improvement technologies. Schematics for conveyor belt, pulley, driveline lifespan, and asset management through KAIZEN. Crusher replacements and maintenance. Tertiary and secondary screen replacements and maintenance. Car dumper maintenance. Ship loader maintenance. Conveyor and chute maintenance. Shutdown and maintenance planning and scheduling through SAP. Asset utilization through SAP. Critical path planning for major shutdowns, maintenance, and asset failure. Cranes – 14t, 20, 25t Frannas – 45t Grove Rough Terrain, 90t Truck Mount, 100t Grove, 220t Grove, 130t Liebherr, 300t Liebherr, 450t Grove.