a

Rio Tinto, Cap Lambert B Expansion

Location: Cape Lambert WA

Industry: Mining

Specialities: Inspections and maintenance, Project Management

BASE Industries consulted with the client and provided maintenance for Rio Tinto Cape Lambert, the biggest of its two Pilbara Iron Ore processing and out loading facilities. Consisting of 4 ship loaders and 5 ore car dumpers and processing 333mt or some of the world finest Iron Ore and the famous Pilbara blend together with its sister site Dampier.

BASE Industries scope of works consisted of:

  • Inspections and maintenance
  • Project management

Access to Solutions

Conveyor belt, pulley, idler, drive, and counterweight replacement and improvement technologies. Schematics for conveyor belt, pulley, driveline lifespan, and asset management through KAIZEN. Crusher replacements and maintenance. Tertiary and secondary screen replacements and maintenance. Car dumper maintenance. Ship loader maintenance. Conveyor and chute maintenance. Shutdown and maintenance planning and scheduling through SAP. Asset utilization through SAP. Critical path planning for major shutdowns, maintenance, and asset failure. Cranes – 14t, 20, 25t Frannas – 45t Grove Rough Terrain, 90t Truck Mount, 100t Grove, 220t Grove, 130t Liebherr, 300t Liebherr, 450t Grove.

Recent Projects

RCR Easteel, Energy Systems

RCR Easteel, Energy Systems

Queensland Nickel Industries

Queensland Nickel Industries

Genesis Energy, Power Plant Project

Genesis Energy, Power Plant Project

    Connect with us

    Contact one of our scaffolding specialists in your state or territory to discuss your project requirements.

    Sign up to our monthly newsletter

    Stay in touch with Base Industries

      Contact