a

Falsework & Shoring

Typically, shoring and falsework refers to a temporary structure that is put in place to offer support while a permanent structure is being constructed. BASE Industries has extensive experience and the right equipment and knowledge to meet a wide range of shoring and falsework requirements for all projects.

  • Specialists in shoring installation
  • Highly trained scaffolders focused on installing and removal shoring systems
  • Kwik-stage shoring & propping system with high loading capacity of 140kn
  • Cantilever shoring systems
  • Soffit shoring system with load capacity of 140kn
  • Universal Formworks system for walls, foundations, columns and slabs
  • Bracket working platform systems for edge protection solutions
  • Heavy duty propping systems; slab/suspended floor loading, load distribution solutions

    Connect with us

    Contact one of our scaffolding specialists in your state or territory to discuss your project requirements.

    Sign up to our monthly newsletter

    Stay in touch with Base Industries

      Contact